Quarker - H2Oto Wash EV charging station
A public EV charger in Quezon City, rated up to 30 kW. The operator lists the cost as ₱30/kWh.
- Address
- Mother Ignacia Avenue, Quezon City, Metro Manila
- Operator
- Not listed
- Charging speed
- DC fast · up to 30 kW
- Connectors
- Not listed — check on arrival
- Cost
- ₱30/kWh (as stated by the operator)
- Bookable on EVChargePH
- No — information and directions only
How long will charging take?
For a typical 60 kWh EV charging from 10% to 80%, expect about 1.7 hours. DC charging slows as the battery fills, so stopping around 80% is usually the quickest way to get back on the road. Work out your own car with the charging-time calculator.
Other chargers nearby
Common questions
Where is the Quarker - H2Oto Wash EV charger?
It is at Mother Ignacia Avenue, Quezon City, Metro Manila. Use the directions link on this page to navigate there with Google Maps.
How fast is the Quarker - H2Oto Wash charger?
It is a DC fast charger rated up to 30 kW. A typical 60 kWh EV would take about 1.7 hours to go from 10% to 80%, depending on the car and battery temperature.
How much does it cost to charge at Quarker - H2Oto Wash?
The operator lists the cost as: ₱30/kWh. Prices can change, so confirm on site or in the operator's app.
Can I reserve the charger at Quarker - H2Oto Wash on EVChargePH?
No. This station is run by another operator and is listed for information only. If you operate it, you can claim the listing for free.
Do you run this charger?
Claim the listing for free to correct the details, add photos and hours.
Claim this station →More in this area: EV charging in Manila · All EV charging stations in the Philippines
Station data © OpenChargeMap contributors (CC BY 4.0). Details can change, so check on site.